Our manufacturing facility comprises of two (2) lines.
Line I
- Line 1 was set up in 1999 and comprises of a five stage pre-heater and pre-calciner and has an installed production capacity of 4,00,000 TPA.
Line II
- Line 2 was set up in 2010 and comprises of a five stage pre-heater and pre-calciner and has an installed production capacity of 7,60,000 TPA.
- Both lines are equipped with RABH technology to minimize pollution and to ensure a dust free environment at our manufacturing facility. RABH is a state-of-the-art technology with high dust collection efficiency for respirable dust. It is preferred system for high temperature operations.
- Our manufacturing facility has been granted various accreditations including ISO 9001:2008, ISO 14001:2004 and BS OHSAS 18001: 2007.